Project Description

Basic Assessment and Water Use Authorisation Application for the proposed extension of the electrical grid corridor for the Impofu Wind Farms (East, West and North), between the Chatty and DEDISA Substations, Gqeberha (Port Elizabeth), Eastern Cape.

Public Participation: DRAFT BASIC ASSESSMENT REPORT

DRAFT BAR

APPENDIX 1 EAP DETAILS

APPENDIX 2 SCREENING REPORT

APPENDIX 3.1 TERRESTRIAL ASSESSMENT

APPENDIX 3.2 FAUNAL ASSESSMENT

APPENDIX 3.3 AVIFAUNA

APPENDIX 3.4 BUTTERFLY STUDY

APPENDIX 3.5 AQUATIC ASSESSMENT

APPENDIX 3.6 ARCHAEOLOGICAL ASSESSMENT

APPENDIX 3.7 PALEO ASSESSMENT

APPENDIX 3.8 AGRICULTURAL STUDY

APPENDIX 3.9 VISUAL ASSESSMENT

APPENDIX 3.10 SOCIOECONOMIC ASSESSMENT

APPENDIX 4 PPP

APPENDIX 5 EMPr